About the construction type and structure 
      They are in accordance with "(3)Specification and civil engineering and construction management standards" of "Common specifications for civil works/ Administration standards for construction etc." established by the Ministry of Land, Infrastructure, Transport, and Tourism of Japan. However they are to be restricted to the earthwork (embankment and earth cut) and road earthwork etc.  
       
      About design section 
      As for the filling shape and cutting ground shape (including the linear),
      input them by using "Road edit" function which is a function
      embedded in UC-win/Road itself (Figure 2). It is also possible to import
      the design data much easily by using LandXML.  
       
      
      
        
          
            
            
              
                
                    | 
                   | 
                    | 
                 
                
                  | Figure 2 Edit of road section | 
                   | 
                  3D laser scanning  modeling service | 
                 
              
             
             | 
           
        
       
      
       
      Standards for work progress control 
      When limiting to the above-mentioned construction type and structure, measurement
      item has only height, width (length of slope) and thickness. The standard
      value can be specified according to the object structure and other standard
      value such as the internal standard value unique to a specific company
      can also be defined (Figure 3). 
      
                  
                    
                      
                          | 
                         | 
                          | 
                       
                      
                        
                        
                          
                            
                              | Measurement item | 
                              Standard value | 
                             
                            
                              | Standard height ▽ | 
                              -50 | 
                             
                            
                              | Length of slope l | 
                              l<5m | 
                              -100 | 
                             
                            
                              | l≧5m | 
                              Length of slope -2% | 
                             
                            
                              | Width w1,w2 | 
                              -100 | 
                             
                          
                         
                         | 
                         | 
                       
                      
                        | Figure 3 Setting of standard value | 
                       
                    
                   
                   | 
                 
              
             
             | 
           
        
       
      
       
      About the road section 
      The point cloud data which can be obtained by using 3D laser scanning service
      of our company etc. and ground level TIN data are applied to the road section.
      By recognizing the road section (Figure 4), it is possible to obtain a
      great deal of measuremed data at every specified measurement point in a
      short time.  
       
      
| 
             | 
           
Figure 4 Comfirming and editing 
            the road section | 
           
        
       
      
       |