International Newsletter vol.26 2009/12
12.15.2009
FORUM8 Co., Ltd
----Headlines----

--------What's New at FORUM8--------

-Result Announcement of the 8th 3D VR Simulation Contest
-UC-win/Road Ver.4.00.01 released

-Overseas Training and Seminars
Seminar schedule in Shanghai is announced below.

 --------What's New at FORUM8--------
 
8th 3D VR Simulation Contest
Awarded works (Released December 9, 2009)
 For another screen shots and movie of all the awarded works from the 8th 3D, VR Simulation Contest
are available to view on the following website.
UC-win/Road video gallary: The 8th 3D VR Simulation Contest 2009-Nov .review
Information of UC-win/Road (awarded works are also introduced here): http://vr.forum8.co.jp/english/
To know more about Forum 8: http://www.forum8.com/


 "VR Data for Ohashi Junction of Metropolitan Expressway"
Metropolitan Expressway Company Limited
The Metropolitan Expressway Co., Ltd. is conducting an experiment with driving simulator. The experiment is to ensure effectiveness in traffic safety at Ohashi Junction, which connects Shinjuku Central Circular Route(under construction), Shinagawa Central Circular Route and Route No.3 Shibuya Line. In this experiment UC-win/Road driving simulator is actively used.
Data of Ohashi Junction used for
traffic safety and effectiveness
Overcrossing 4 roads in limited space


"VR simulation of Design Change of Korea Namhae Highway "
Korea Road Agency
 
UC-win/Road was used for consensus building with the local residents at Korea Namhae Highway, which is under construction.
There are two plans, initial plan and the current one, and include objections from local residents. Various kinds of simulation were done, including simulation of influence to local residents by the distance from the road. The data was used as discussion material for the consensus with residents and related agencies.
Daedong Jct. Revised due to LRT construction plan


"Simulation of railway bridge construction work"
Noda Engineering Co., Ltd.
 
To increase the carrying capacity of the railway, replaced a railway bridge for double track railway. The installation work must be finished at midnight and should be done with minimum impact on the road below the railway. Speedy and economical method was being investigated and the construction simulation was done with VR.
Simulation of Railway Bridge Beam
Construction Work
Removed beam is hanged by
crane and the crane rotates


 "Simulation of traffic in Kyoto"
University of Kyoto Graduate School
For the purpose of collecting data on human driving behavior in urban areas. By reproducing Kyoto City data using UC-win/Road driving simulator we create a realistic driving simulation environment with VR from which the explanation of data including the impact of traffic can easily be displayed.
Simulation of Traffic in Kyoto City Reproduces the traffic condition in
Shijo Kawaramachi, the busiest area


 "VR Data of Roundabouts in US 41 Projct"
Ourston Traffic Solutions, Inc.
The Wisconsin Department of Transportation (WisDOT) plans to reconstruct and expand US 41. This work is made by Ourston, which was asked by WisDOT, to teach WisDOT and to educate people in the correct driving operation when it comes to roundabouts, by using driving simulator.
VR Data of Roundabouts in
US 41 Project
Made to educate people on the
correct way to drive at roundabouts.


Judges

Mr. Hiroo Kasagi (NPO Chiiki Zukuri Kobou)
Mr. Fumio Seki (Taisei Engineering Co., Ltd.
Mr. Sinsuke Kitagawa (Yachiyo Engineering Co., Ltd.)
 

Regional Construction Award Mr. Hiroo Kasagi (NPO Chiiki Zukuri Kobou)
 "Proposal of Reproducing Environmentally-friendly Waterland City Hino"
Hosei University
In Hino City, which was once one of the largest farm areas in Tokyo, a water channel network for irrigation was developed in the Tama River and Asakawa area. The city of Hino, in response to the rapid increase in population from 1960's actively redeveloped land and now 50% of the city is designated as redeveloped. In these areas many of the water channels were lost. Total length of the canal was 218km, 177km in 1977, and it is now said that only 130km remain.In 1995, the area was designated as "Town of Water" by then Ministry of Land, however, the rural landscape is certainly gone, the number of channels has decreased. Therefore we are proposing a new type of land redevelopment utilizing the water-rich environment around the channels of Hino City.
Environmentally-friendly land
readjustment plan of Waterland City Hino
Electric power generation by
the use of small water channel

Design Award Mr. Fumio Seki (Taisei Engineering Co., Ltd.)
 "VR Project of Beijing Guomian Group (Jingmian Second Factory)''
Beijing Water Cube Digital Technology Co.,Ltd.
Guomian Group is located to the east of Beijing CBD, overlooking from its main gate, the landmark buildings, such as CCTV, China International Trade Center and Huamao. In the 1950s, designers of the former Soviet Union designed and the construction has begun. Interior decoration reflects those days style. With UC-win/Road, showing in VR the old plant of the Guomian second plant and the new plant, which will be relocated in near future and change to Cultural and Creative Industrial Park in VR.
Jingmian 2nd Factory- office room
and an old made-in- China fan

Appearance of Jingmian 2nd Factory

Artistic Award Mr. Sinsuke Kitagawa (Yachiyo Engineering Co., Ltd.)
 "Creation of road which passes through Aso Kuju National Park"
Nishitetsu C.E.Consultant Co.,Ltd
This VR data shows planned four-lane road of national highway that passes through the Aso Kuju National Park (Scenic Byways).
Construction of this route must be done in order to cause minimum impact on the railway alongside of the road, in addition to caring for the steep terrain. So not only the driving simulation environment (internal), but also the influence on the surrounding area must be considered. With VR data, proposed the landscape examination and the ease of traffic congestion.
Aiming to create a road which is
suitable for the Aso Kuju National Park
Planned model of 4-lane "Scenic Byway"


"Road Monitoring System"
Temasek Polytechnic (Singapore)
The road monitoring system is a system that acts as a virtual driving simulator to assist drivers in rehabilitation and assessment. Therefore the simulator will be able to test the users physical condition and problem solving skills in order to rate their condition.
Proposal of a rehabilitation supporting system

"Transfer VR simulation at Junjon Service Area in Korea"
GTSM Inc. (Korea)
VR simulation by using UC-win/Road was conducted for Junjon Service Area, which is managed by Seoul Regional Land Management Office. To ease traffic jams on the roads to the neighbouring cities, the simulation by UC-win/Road was used to support decision making of 3 plans including creation of bus-lane and rotary intersection.
VR accelerated the decision making of the project

"VR Simulation of Pedestrian Behavior at Pedestrian Bridge Construction"
Shanghai Chikushi Construction Design Co., Ltd. (China)
VR model shows the pedestrian behavior and flow at the time of renovation and construction of a pedestrian bridge in the United Kingdom (about 150m). Results of the data from the crowd analysis software have been linked to UC-win/Road, and the intuitive presentation has become possible. The data was used for reproducing the planned completed construction and for further safety as well as simulating the pedestrian flow.

VR Simulation of Pedestrian Behavior Result of the regulated Pedestrian flow

 
UC-win/Road Ver.4.00.01 (Released December 9th)For more information, visit http://vr.forum8.co.jp/english
1. Improved cuttings and banks and rounding of a small stage
  • We have improved the setting method of cuttings and banks. It allows the setting of width, angle of slope and textures for each stage on the right and left side. Setting is done with each tab. You can set the texture for each stage by using the Edit button. In addition, the rounding can be set to the small steps part. If the rounding radius is set, making the small steps part where roundness was worn becomes possible.
    Road section editing- cuttings tab   rounding image

2. Geographical features in the world
(Available to import CGIAR-CSI SRTM 90m Digital Elevation Data for the entire world.
China and Australia are installed)

  • We have enhanced the geographical features of the existing UC-win/Road.
    Using the "CGIAR-CSI SRTM 90m Database" for all parts of the world, geographical features of China and Australia are installed in UC-win/Road, as well as 50m mesh geographical features, altitude data of Japanese Geographical Survey Institute and 50m mesh New Zealand. Other countries data will be available on demand. The selection of the geographical features data can be integrated into the user Interface of UC-win/Road, the geographical features grid of the same size is made with Japan and New Zealand, and the geographical features of 36km x 36km or less can be read.


  • Example of geographical data: China
    Geographical features DB:
    CGIAR-CSI SRTM 90m Database:

    http://srtm.csi.cgiar.org/
3. Context (function to save the settings)
  • In VR, you can see from various views and compare by the varied settings. This concept was strengthened in UC-win/Road 4 and the context function was developed. You can save many settings as follows and the context setting is executed easily to make this setting more effective.

    Traffic flow settings, whole drawing option, Showing the selection of before/after,
    State of view position and scenery view


4. Traffic connector (connecting function of road and traffic)
  • This function allows you to move from one road to another at the time of driving, manual driving and driving the car in a traffic flow. From editing display or the main menu, make a virtual pipe that ties one node to another node and set the movement of traffic.


5. Creating and customizing function for vehicle model, reproducing engine braking and creep phenomenon
  • We have improved vehicle dynamics model of UC-win/Road. The braking of the vehicles engine is displayed and the method of calculating the driving performance of the engine was updated.


    Edit screen of vehicle performance file
6. Improvement of the special effect of the weather expression

7. Improvement of lighting function (vehicle headlight, bloom function of object, light source of the spotlight)

  • The lighting function was added to UC-win/Road Ver.4. It has been developed to improve the simulation at nighttime in VR space.

    • The headlight of the car was replaced from a spotlight to a more advanced lighting function.
    • A default spot light source can be arranged. You can use it for the lighting of the town or the shopping street, etc. The number of models and light source is not limited and can be arranged as well as the usual 3D model.
    • It is possible to display the bloom function to make objects glow. For instance, you can use it for a signal lightm, and a light in a window or the light of a vehicle.

    8. 3D stereo display
    • 3D stereo display function is shown as standard. 3D stereo display is a means to show three-dimensional image by using a right and left parallax. In UC-win/Road adapts the inclination (passive) method to display in multiple screens using a right and left parallax and an active method using a Quadro video chip of NVIDIA that displays in the one screen right and left images alternately. Special glasses are necessary respectively. Moreover, you can also make them display in wide 3D, because it corresponds to the display of maximum 6ch.

    9. Renewed user Interface
    • We reviewed the user Interface totally including the user Interface of UC-win/Road Ver4. A lot of improvements were implemented on the start screen as well as the simulation panel.

      Start screen
--------Upcoming Events--------
Overseas Training and Seminars

Seminars in Shanghai will be held on the following schedule.

Venue:
Shanghai - Shanghai Seminar room (FORUM8 Technology Development(Shanghai) Co., Ltd)

Seminar Date City
UC-win/Road VR March 3, 2010 Shanghai
UC-win/Road SDK February 24, 2010 Shanghai
EXODUS/SMARTFIRE  January 27, 2010  Shanghai 
Engineer's Studio, 
UC-win/FRAME (3D)
December 16, 2009 Shanghai
March 17, 2010 Shanghai
 xpswmm January 13, 2010  Shanghai 
 Maxsurf March 5, 2010 Shanghai 
OSCADY/TRANSYT  March 10, 2010 Shanghai
 Multiframe March 12, 2010 Shanghai 
 Design Builder March 24, 2010 Shanghai 
 Retaining wall design/Temporary sheathing work design Chinese January 20, 2010  Shanghai 
Summary
Participation Fee Free


For more information and applications, please email us at

mailto:forum8@forum8.co.jp



Gross circulation: 3,883

When you send a request to unsubscribe from our mailing list, please include "Unsubscribe"
in the subject title of your email and send it back to us.

Thank you for your continued support.

FORUM8 Co., Ltd. mailto:forum8@forum8.co.jp
2-1-1 Nakamegruro GT Tower 15F
Kamimeguro Meguro-ku Tokyo 153-0051 JAPAN
TEL +81-3-5773-1888
FAX +81-3-5720-5688
http://www.forum8.com